Wirebound Soft-Cover Project-Planning Notebook, Project-Management Format, Black Cover, (80) 9.5 x 6.5 Sheets
Wirebound Soft-Cover Project-Planning Notebook, Project-Management Format, Black Cover, (80) 9.5 x 6.5 Sheets
Regular price
$16.21
Sale price
$16.21
Regular price
$0.00
Shipping calculated at checkout.
Overview
Overview
Description
Description
Organize tasks, record target deadlines and create actionable-item lists. Well-designed project-planning templates on each page help make tracking various threads and all the details as easy as dotting the I's and crossing the T's. Flexible soft-cover and twin-wire coil binding enable effortless page turning. Premium heavyweight paper ensures a smooth writing experience. Margin micro-perforations allow for neat and easy sheet removal.
Specification
Specification
| Global Product Type | Business Notebooks & Journals |
| Pocket-Sized Indicator | No |
| Book-Binding Type | Wire-O |
| Book-Binding Details | Twin-Wire: Soft Cover |
| Book-Binding Edge | Side |
| Cover Color | Black |
| Color Family | Black |
| Book-Spine Length | 9.5" |
| Book Width | 6.97" |
| Front-Cover Material | Coated Paper |
| Back-Cover Material | Coated Paper |
| Number of Subjects/Sections | 1 |
| Sheets per Book/Journal | 80 |
| Sheet Size (Bound-Side First) | 9.5 x 6.5 |
| Sheet Color | White |
| Sheet Rule/Format Type | Project-Management Format |
| Sheet Rule/Format Details | Project Planner Elements |
| Sheet-Ruling Color | Black |
| Sheet Perforation Details | Micro-Perforation |
| Number of Pockets | 1 |
| Pocket Details | Loose-Sheet Pocket |
| Dated/Undated | Undated |
| Product Biodegradability Indicator | N |
| Product Biodegradability in Days | 0 |
| Product Compostability Indicator | N |
| Pre-Consumer Recycled Content Percent | 0% |
| Post-Consumer Recycled Content Percent | 0% |
| Total Recycled Content Percent | 0% |

