Gridded Magnetic Porcelain Dry Erase Project Planning Board, 1" x 2" Cells, 72" x 48", White Surface, Satin Aluminum Frame
Gridded Magnetic Porcelain Dry Erase Project Planning Board, 1" x 2" Cells, 72" x 48", White Surface, Satin Aluminum Frame
Regular price
$1,115.24
Sale price
$1,115.24
Regular price
$0.00
Shipping calculated at checkout.
Overview
Overview
Description
Description
Organization is vital for the success of every business or enterprise. MasterVision® Dry-erase Planning Boards are excellent tools that allow you to plan and track projects. Keeping important tasks on display, organizing work-groups or just planning ahead is practical and easy with the 1" x 2" gridded surface. The porcelain magnetic dry-erase surface resists staining, ghosting and scratching to keep its bright, high-quality appearance through years of extensive use. The aluminum frame includes a four corner mounting system that makes installation a breeze. The contemporary sliding aluminum pen tray offers a convenient way to keep your writing utensils within quick reach.
Specification
Specification
| Board Surface Type(s) | Dry Erase |
| Global Product Type | Preformatted Dry Erase Boards |
| Magnetic Board Surface | Yes |
| Surface Material | Porcelain |
| Surface Color | White |
| Dedicated Projection Screen | No |
| Flipchart Mounting System | No |
| Frame Material | Aluminum |
| Frame Color/Finish | Satin |
| Board Width | 72" |
| Board Height | 48" |
| Preformatted Board Surface | Yes |
| Preformatted Surface Details | Project Planning & Tracking Spreadsheet (1" x 2" Cells) |
| Supports Custom Surface Formatting | No |
| Grid Columns | 23 |
| Grid Rows | 45 |
| Mounting Details | Four-Corner Wall-Mount System (Included) |
| Product Biodegradability in Days | 0 |
| Package Includes | Accessory Tray/Rail; Mounting Kit |
| Compliance Standards | ISO 9001-2008 |
| Pre-Consumer Recycled Content Percent | 0% |
| Post-Consumer Recycled Content Percent | 0% |
| Total Recycled Content Percent | 0% |

