Assy, Maxirest (Set LH/RH) Deluxe Plastic Rails Long Leadtime
Assy, Maxirest (Set LH/RH) Deluxe Plastic Rails Long Leadtime
Regular price
$990.00
Sale price
$990.00
Regular price
$0.00
Shipping calculated at checkout.
Description
Description
Maxi Rest features an adjustable sleeping surface with three width and two length settings.
Robust steel two-piece split-frame construction for ease of delivery and transport
Bed deck width is expandable from 39 inches (99.06 cm) to 54 inches (137.16 cm)
Bed deck length is adjustable from 80 inches (203.20 cm) to 88 inches (223.52 cm)
5 inch Deluxe Caster Set includes 2 Total-Lock and 2 Steer-Lock for ease of maneuverability
Standard 3-Function Positioning hand control
Optional 5-Function Positioning hand control (Trendelenburg / Reverse Trendelenburg and Chair positioning)
Synchronized Hi/Lo Motors ensure bed remains level
Battery backup standard for dependability
Optional Intuitive side rail system for both head and foot sections
Optional laminate wood grain or plastic molded head and foot board options
Optional factory-installed weight scale system
Maxi Rest 4054 Series
Safe working load: 1,000 lb (453.6 kg)
Maxi Rest 4842 Series
Safe working load: 800 lb (362.9 kg)
Specification
Specification
| Category | Beds, Long Term Care |
| Subcategory | Bariatric |
| Family Name | Gendron® Bariatric Beds |
| Unit of Measure | 1EA |

