{"product_id":"assy-maxirest-set-lh-rh-deluxe-plastic-rails-long-leadtime","title":"Assy, Maxirest (Set LH\/RH) Deluxe Plastic Rails Long Leadtime","description":"\r\u003cbr\u003eMaxi Rest features an adjustable sleeping surface with three width and two length settings.\r\u003cbr\u003e\r\u003cbr\u003e    Robust steel two-piece split-frame construction for ease of delivery and transport\r\u003cbr\u003e    Bed deck width is expandable from 39 inches (99.06 cm) to 54 inches (137.16 cm)\r\u003cbr\u003e    Bed deck length is adjustable from 80 inches (203.20 cm) to 88 inches (223.52 cm)\r\u003cbr\u003e    5 inch Deluxe Caster Set includes 2 Total-Lock and 2 Steer-Lock for ease of maneuverability\r\u003cbr\u003e    Standard 3-Function Positioning hand control\r\u003cbr\u003e    Optional 5-Function Positioning hand control (Trendelenburg \/ Reverse Trendelenburg and Chair positioning)\r\u003cbr\u003e    Synchronized Hi\/Lo Motors ensure bed remains level\r\u003cbr\u003e    Battery backup standard for dependability\r\u003cbr\u003e    Optional Intuitive side rail system for both head and foot sections\r\u003cbr\u003e    Optional laminate wood grain or plastic molded head and foot board options\r\u003cbr\u003e    Optional factory-installed weight scale system\r\u003cbr\u003e\r\u003cbr\u003eMaxi Rest 4054 Series\r\u003cbr\u003e\r\u003cbr\u003e    Safe working load: 1,000 lb (453.6 kg)\r\u003cbr\u003e\r\u003cbr\u003eMaxi Rest 4842 Series\r\u003cbr\u003e\r\u003cbr\u003e    Safe working load: 800 lb (362.9 kg)","brand":"Graham-Field","offers":[{"title":"Default Title","offer_id":49949521674517,"sku":"GFGL927100","price":990.0,"currency_code":"USD","in_stock":true}],"url":"https:\/\/unitedsupplycorp.com\/products\/assy-maxirest-set-lh-rh-deluxe-plastic-rails-long-leadtime","provider":"United Supply Corp.","version":"1.0","type":"link"}